With the hotel’s ballroom lift proving unreliable and surveys detecting corrosion to both the platform deck and supporting framework, JBA was asked to devise and oversee an appropriate remedial programme.
read more
Given the age and basic design of the original installation JBA recommended a replacement MRL passenger lift for a residential block of flats built over three floors with 71 self-contained apartments.
read more
Following a major equipment failure, JBA was asked to survey the site, establish a cause, assess the damage and put forward a report on the lift’s future operation.
read more
The Kensington Forum hotel is the busiest Holiday Inn in the UK, with six high-rise guest lifts serving 28 floors, travelling at speeds of 3.5m/s.
read more