Findings & recommendations
J Bashford and Associates
were engaged to carry out an inspection and provide a full report
detailing the current condition of the equipment and recommend
restorative works.The lift control panel and lift plant room
equipment had been subjected to heat and smoke damage. Although
the control panel appeared externally to be in an acceptable
condition, we advised against the retention and re-use. Given
the potential for an adverse effect on the safe operation of
the lift and continued component failure complete
replacement of the lift plant room equipment, control panel and
floor selection equipment was required. |
The lift hoisting
unit reduction gearbox and drive motor had also subject of significant
heat and smoke damage. Therefore complete replacement, including
fixings and sound isolation mountings was required.
The lift guide rails
and guide rail brackets, particularly in the area adjacent to
the source of the explosion has suffered significant material
damage and distortion. The damaged lift shaft equipment including
limit switches, landing door equipment, emergency stop switches
and wiring trunking/conduit, particularly in the area adjacent
to the source of the explosion has suffered significant material
damage and therefore replacement will be required. |